Timber Howe Truss Bridge over the Kootenay River at Bonners Ferry, Idaho

As mentioned in the Home Page, is the construction of this unique bridge construction, a main aspect of my hobby.
I intend the entire bridge in the length of six modules to build each on 4.5 feets in scale 1:29. There are currently three bridge elements with the short-South Shore Trestle are completed. For a bridge element I need approximately 200 hours of construction time.
Two items I use in the summer months in the outdoor layout ( on the canyon). The three remaining bridge elements and Trestle are, or will be installed in the indoor layout as modules. (See page "INDOOR LAYOUT
")

 
    

Image of the first module (shore side) with the Trestle.

On the bridge there is an SD 40-2 with Coal Hoppers

 

 



     

Two images of the two Howe Truss elements in the canyon of the outdoor layout.

 


 
 

Intakes from the bird perspective of the shore module

 

 

Detail pic from the shore.

 

 

Coal Train on the canyon.

 

 

 



Respect. . ! This site is under construction. It may take until the summer of 2010, until all sides are decorated ready. Please have a look again!


May 2010 / the mountaineer

top